50000 to 500000 ton per year petroleum process plant design and installation

Daily 1000 ton crude refinery oil distillation plant 5
  • Design capacity: 50000 to 500000 ton per year
  • Work pressure: see drawings
  • Max. work temperature: 500 Degree Celsius
  • Operation ambient temperature: see drawings
  • Warranty period: 1 year
  • Installation type: site assembly
  • Main process: atmospheric distillation, fluid catalytic cracking
  • Design working life: 20 years
  • Applicable raw material oil: light petroleum, medium crude oil, heavy petroleum, condensate, and so on.

Delivery List

  • Heating furnace
  • Towers/columns
  • Heat exchange unit
  • Medium transfer tank
  • Tail gas buffer tank
  • Tail gas recovery and burning unit
  • Flue gas desulfurization and purification unit
  • Pipelines and pipe fittings in the battery limit
  • Instrument and meters
  • Valves
  • Safety Valve
  • Sight Glass
  • Gaskets, bolts and nuts
  • Fans and pumps
  • Electric control cabinet
  • Electric cables in the battery limit
  • Process and Maintenance platform
Daily 1000 ton crude refinery oil distillation plant 2
Daily 1000 ton crude refinery oil distillation plant 3